Double Z Construction
Groveport Road at Alum Creek Drive
What makes it interesting?
This setup with two roundabouts is expected to be the first of its kind in Central Ohio. On average it is estimated that a trip through the new interchange would save drivers nearly four minutes, rather than waiting at the traffic light.
How HCSS Software assisted with this project
Both HeavyBid and HeavyJob were used during the project, allowing Double Z Construction to remain competitive and track all associated project costs, time, and quantities.
Project Description:
On average, more than 41,000 trucks and automobiles travel through theIntersection of Alum Creek Drive and Groveport Road each day. At this key Rickenbacker-area intersection, construction was aimed to ease congestion and prepare the roadway for future, increased traffic. The $10 million project entailed construction of two roundabouts on Groveport Road — one east and one west of the Alum Creek Drive and Groveport Road intersection — that are connected by a flyover bridge or overpass that allows traffic to move more efficiently.